Power Distribution & Medium Voltage Systems

Bowe & Gant provides a complete spectrum of medium voltage and >600v power distribution services to commercial, industrial, manufacturing, and municipal clients. Our services are available throughout the South Jersey and greater Philadelphia area.

Medium voltage systems distribute power while regulating and controlling the flow of power. They are typically used in industrial and commercial facilities, and residential communities. The equipment includes transformers, switchgear, circuit breakers, and other equipment. It’s function is ultimately to regulate the flow of power from the power lines to the end user’s equipment.

Whether you have an underground, overhead, or aerial system, we are fully stocked with the equipment, tools, and manpower to complete the project within the customers expectations and financial constraints. We provide power distribution services to clients ranging from construction management firms and general contractors, to direct contracts with facility owners and operators.

If you have a need for power distribution and medium voltage systems installation, repairs or upgrades, reach out to the professionals at Bowe & Gant today. Our professionals are ready to get the job done right.

Power Distribution and Medium Voltage services offered (but not limited to):

  • Buss Duct Systems 
  • Design Build & Design Assist 
  • Indoor & Outdoor Substation Construction
  • Medium Voltage Cable Terminations & Splicing 
  • Manholes, Vaults, & Transformer Pads
  • Pole Line Aerial Distribution 
  • Switchgear Installation
  • Transformer Installation 
  • Temporary Poles & Service Equipment 
  • Underground & Overhead Distribution Systems

Project 1

power distribution

Design build installation of a 4” PVC concrete encased duct bank to provide pathways to power new 480 volt conveyors and process equipment at a recycling plant.

Project 2

An existing waste water plant with (3) individual utility supplied services was retrofitted with new service and distribution equipment while maintaining continuous plant operations.

Project 3

Retrofit 4160v switch gear into existing control house and new split cable tray system to pump yard.